Carrier operating and maintanance Specifikace Strana 62

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 116
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 61
5-376-000097
REV. 1 - 12/08
Section II: Operation
Page 52
1. Turn on the safety and work
lights. (Switches are located on
the switch panel in the dash.)
2. Position the rear of the carrier
about 4 feet from the vehicle you
intend to load. Make sure you
are in line with the vehicle.
3. Place the carrier’s transmission
gear selector into Neutral or Park
and set the parking brakes.
4. Engage the power take-off
(PTO). Refer to PTO operator’s
manual. NEVER TRAVEL WITH
THE POWER TAKE-OFF
CONTROL ENGAGED. This
could result in damage to the
PTO unit and the recovery
vehicle’s transmission.
OUT
OUT
POWER
WER
TAKE-OFF
AKE-OFF
4 FT
P
R
N
4
2
1
D
BE
ACON
LIGH
T
AU
X
WAR
N
REAR
FLO
OD
WORK
LIGHT
MASTE
R
0
N
0N
0
N
0
N
0N
Zobrazit stránku 61
1 2 ... 57 58 59 60 61 62 63 64 65 66 67 ... 115 116

Komentáře k této Příručce

Žádné komentáře