Carrier operating and maintanance Specifikace Strana 59

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 116
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 58
5-376-000097
REV. 1 - 12/08
Section II: Operation
Page 49
3. To release the ratchet, simply
pull on the locking bar,
disengaging the teeth and raise
the handle to the “free spool”
position.
INSTALLING THE FRONT TIE-DOWN CHAINS
1. Using the RTJ hook cluster
chains, insert the appropriate
hook into the vehicle frame tie
down hole or slot. Refer to the
AAA or vehicle
manufacturer's towing
manual for the correct
attachment points.
2. Insert the other end of the chain
into the keyslot in the deck.
Adjust the chain so that it is as
tight as possible.
3. Repeat for the other side.
CAUTION:
NEVER walk or climb on the deck surface.
Zobrazit stránku 58
1 2 ... 54 55 56 57 58 59 60 61 62 63 64 ... 115 116

Komentáře k této Příručce

Žádné komentáře