VAV Fan Terminal Zone Controller
(33ZCFANTRM) —
The input and output channel as-
signments are shown in Table 4.
The zone controller provides eight analog inputs.
ANALOG INPUTS — The analog inputs consist of four ther-
mistor type inputs and four 0 to 10 VDC inputs. The thermistor
inputs conform to the nominal 10K thermistor values in
Table 1.
TRIAC OUTPUTS The zone controller has four 24-VAC
triac outputs on the baseboard and two on the output board.
These outputs are capable of switching 24 VAC at 1 Amp with
a power factor of 0.8. Two triacs control the primary damper.
One triac is used to rotate the damper clockwise and the other
is used to rotate the damper counterclockwise. The two other
triacs are dedicated to the control of either proportional or two
position heat and are used to control the secondary damper
actuator.
The specific output requirements for the air terminal appli-
cations are given in Table 5.
RELAY OUTPUTS These relays are designed to switch
24 VAC as a maximum voltage at up to 1 amp with a power
factor of 0.8. The relays provide fan off/on control and control
a third stage of electric heat if used.
Table 4 — Zone Controller Inputs (33ZCFANTRM)
LEGEND
W —
Wiper of Potentiometer
*Required whenever ducted heat is to be controlled. If monitoring of supply air is required the zone controller must be configured for heat even if
the box does not contain heat. It is also required for stand-alone operation.
Primary air sensor is required whenever unit is configured as a master zone controller and non-CCN air source is used..
**24v connection (J4-16) is required for RH sensor only.
††Option required on Constant Volume Dual Units for zone pressure control. 33ZCSECTRM is required.
Table 5 — 33ZCFANTRM Zone Controller Outputs
*These terminals provide 24 VAC-output power to the load.
The zone controller comes wired and configured for clockwise closure of the primary air damper. Do not change wiring to change rotation. The
installer should configure the rotation decision with Carrier software to ensure transducer calibration integrity.
CHANNEL
NAME
J4
TERMINATION
DESCRIPTION DEVICE
SPT
14,12 (ground) Space Temperature Sensor (33ZCT55SPT), field installed and wired 10K Thermistor
SAT
10,12 (ground) Supply Air Temperature Sensor, required for heat,
field installed and wired*
10K Thermistor
SP_OFFST
12 (ground), 8 Set Point Offset Adjust, requires the use of field-installed
33ZCT56SPT space temperature sensor
100K Potentiometer
PAT EM P
4, 6 (ground) Primary Air Temperature Factory option field installed and wired 10K Thermistor
RH/IAQ**
16 (24v), 15 (+), 13 (-) RH/IAQ Sensor Factory option, field installed and wired 0-10 VDC
DMPPOS
9 (10v), 7 (W+), 5 (-) Primary Damper Position Factory Supplied and wired with zone controller 0-10 VDC
TEST
3, 1 (GND)
Used to test the output of the airflow transducer.
Airflow Sensor
(1-5 VDC)
SECFLO
9 (10v), 11 (+), 13 (-) Secondary Airflow Sensor†† 1-5 VDC
REMOTE
2 (24 vac), J1 Pin 1
(24 vac)
Remote Occupancy Contact
Dry contact switch
with 24 vac supplied
by power connection
CHANNEL (NUMBER) J5 TERMINATION’S DESCRIPTION
DMPR_ CCW
1*, 2 Primary Damper CCW (factory wired)
DMPR_CW
2, 3* Primary Damper CW (factory wired)
HEAT_ST1
4, 5 (24 VAC externally supplied) Heat Open or Heat First Stage (field wired)
HEAT_ST2
6, 5 (24 VAC externally supplied) Heat Close or Heat Second Stage (field wired)
FAN
J6-1(24 VAC externally supplied), J6-2 (Common, N/O) FAN Fan Start/Stop
HEAT_ST3
J7-1 (24 VAC externally supplied), J7-3 (Common, N/O) Heat Third Stage
2_DMP_CCW
J8-1, J8-2 Secondary Damper CCW
2_DMP_CW
J8-2, J8-3 Secondary Damper CW