Installation, Start-Up and
Service Instructions
CONTENTS
Page
SAFETY CONSIDERATIONS ...................1
GENERAL ...................................1
INSTALLATION .............................1-14
Step 1 — Complete Pre-Installation Checks ...1
Step 2 — Rig and Place Unit .................7
RIGGING
PLACING THE UNIT
VIBRATION ISOLATION
POSITIONING THE 09BY UNIT
VERTICAL DISCHARGE
Step 3 — Install Accessory Low-Ambient
Kit or Inlet Filter Kit (If Required) ...........8
Step 4 — Install Rain Drain ..................9
Step 5 — Complete Refrigerant Piping .......9
GENERAL
REFRIGERANT LINE SIZING
PRESSURE RELIEF
REFRIGERANT RECEIVER
COIL CONNECTIONS
LIQUID LIFT
SWEAT CONNECTIONS
FIELD PIPING
MANIFOLDING CIRCUITS
CHECK VALVE
SERVICE VALVES
Step 6 — Ductwork .........................11
CONDENSER AIR DUCT INSULATION
Step 7 — Insulate the Unit ..................12
Step 8 — Complete Electrical Connections ..12
GENERAL
MAIN POWER WIRING
CONTROL CIRCUIT POWER WIRING
GENERAL WIRING NOTES
START-UP ..................................15
System Evacuation and Dehydration .........15
Charging Procedure .........................15
Check Operation of Condenser Fan Motor
Controls and Rotation of Fans .............15
Adjust Fan Speed ...........................15
SERVICE ..................................15-17
Cleaning Condenser Coils ...................15
Lubrication .................................15
Condenser Fan Adjustment ..................15
TO CHANGE FAN SPEED
PULLEY ALIGNMENT
BELT TENSION ADJUSTMENT
TO CHANGE FAN WHEEL
TO REPLACE FAN BEARING
MAINTENANCE .............................17
Cleaning ....................................17
Inspection ..................................17
Air Filters ...................................17
Page
Condensate Drain ...........................17
TROUBLESHOOTING ........................17
START-UP CHECKLIST ................CL-1,CL-2
SAFETY CONSIDERATIONS
Installing, starting up, and servicing air-conditioning equip-
ment can be hazardous due to system pressures, electrical
components, and equipment location.
Only trained, qualified installers and service mechanics
should install, start-up, and service this 09BY equipment
(Fig. 1).
When working on the equipment, observe precautions in
the literature and on tags, stickers, and labels attached to the
equipment.
Follow all safety codes. Wear safety glasses and work gloves.
Keep quenching cloth and fire extinguisher nearby when braz-
ing. Use care in handling, rigging, and setting bulky
equipment.
ELECTRIC SHOCK HAZARD
Separate power sources (main and control
power circuits) are used for these units. Be
sure both main and control power circuits are
disconnected before servicing.
GENERAL
The 09BY air-cooled condenser is a remote air-cooled con-
denser designed to be used with the 50BZ vertical packaged
units. See Table 1. Airflow is horizontal, both into and out
from the same face of the unit. The unit is designed to be
mounted indoors in a window, through the wall in high-rise
buildings, or on the wall on the building exterior. See Fig. 2
for typical applications. Ductwork is not needed, but may be
added easily if required by the application. Airflow is pro-
vided by centrifugal fans with an adjustable belt drive to meet
varying static requirements. Units may also be matched with
other compressor and evaporator combinations. Contact your
local representative for more details.
Check space requirements, service clearances, floor strength,
location of piping, size of power supply, and location of duct-
work (if used) before installing. See Fig. 3 for unit dimen-
sions and Table 2 for unit operating weights.
INSTALLATION
Step 1 Complete Pre-Installation Checks
Examine unit for damage incurred during shipment. File claim
immediately with transit company if damage is found. Check
the shipment for completeness. Verify that the nameplate elec-
trical requirements match the available power supply.
09BY006-024
Remote Air-Cooled Condenser Units
5to20Tons
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2 4
Tab 4a 4a
PC 111 Catalog No. 530-912 Printed in U.S.A. Form 09BY-3SI Pg 1 4-99 Replaces: 09BY-2SI
Zobrazit stránku 0
1 2 3 4 5 6 ... 19 20

Shrnutí obsahu

Strany 1 - Service Instructions

Installation, Start-Up andService InstructionsCONTENTSPageSAFETY CONSIDERATIONS ...1GENERAL ...1INSTAL

Strany 2 - Fig. 1 — 09BY Units

Procedure for Using the Refrigerant Receiver (Fig. 9)During Normal Operation — Valve A is open and valves Band C are closed. Receiver is isolated from

Strany 3

Table 3 — Minimum Refrigerant Line Size DataUNIT09BYLENGTH OF PIPE0to15ft 16to25ft 26to50ft 51to75ft 76to100ftQtyHot GasLine(in.)LiquidLine(in.)QtyHot

Strany 4 - Fig. 3 — Base Unit Dimensions

3. A high-density fiberglass (2 lb minimum density) or semi-rigid foamed insulation such as Styrofoam™ will be re-quired inside the ducts to prevent ai

Strany 5

GENERAL — Verify that nameplate electrical requirementsmatch available power supply. Voltage at condenser must bewithin the minimum and maximum shown

Strany 6 - Table 2 — Physical Data

Condenser operation on improper line voltage or exces-sive phase imbalance may be considered abuse and any re-sulting damage may not be covered by Car

Strany 7 - Step 2 — Rig and Place Unit

START-UPTo prevent personal injury, be sure wire fan guards aresecured in place over each fan discharge (or that fansare ducted) before starting the u

Strany 8

Table 5 — Condenser Fan PerformanceUNIT09BYSTATIC PRESSURE (in. wg)CFM0.0 0.2 0.4 0.6 0.8 1.0Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp Rpm Bhp0062000 67

Strany 9

TO CHANGE FAN WHEEL — If a fan wheel should fail,it may be replaced as follows:1. Remove belts from fan pulley.2. Loosen locking collars on the fan be

Strany 10 - C—Receiver Outlet valve

Copyright 1999 Carrier CorporationManufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and w

Strany 11

START-UP CHECKLISTA. Preliminary InformationCOMPRESSOR BEARING UNIT: MODEL NO. SERIAL NO.09BY UNIT: MODEL NO. SERIAL NO.FIELD-INSTALLED ACCESSORIESB.

Strany 12

VIEW A-A006-014 UNIT SIZEVIEW A-A008-014 UNIT SIZEVIEW B-B016-024 UNIT SIZEFig. 1 — 09BY UnitsRIGHT SIDE VIEW REAR VIEW (HORIZONTAL DISCHARGE) LEFT SI

Strany 13

CHECK VOLTAGE IMBALANCEIS CONDENSER MOTOR WIRED FOR CORRECT VOLTAGE? (Y/N)LINE-TO-LINE VOLTS: AB VACVBCV(AB + AC + BC)/3 = AVERAGE VOLTAGE =VMAXIMUM D

Strany 14

LEGENDRefrigerant ConnectionField-Supplied Refrigerant Piping*Field-Supplied Floor Stand (Height to Match Wall Opening).09BYDISCHARGEDUCTINLETDUCTTO O

Strany 15

09BY DIMENSIONS (English)DIMENSION006(Ft-in.)008(Ft-in.)012(Ft-in.)014(Ft-in.)016,024(Ft-in.)A 2-111⁄23- 613⁄163- 613⁄163- 613⁄165- 0B 1- 711⁄161-115⁄

Strany 16

36" MIN.REQUIREDSEE NOTE 2ELECTRICALACCESS36"CORNER CCORNER BAIRFLOWALLOW ACCESSTO CLEANCONDENSERCOIL36"RECOMMENDEDBELT

Strany 17

Table 1 — Indoor Circuit/Condenser ApplicationUNIT50BZ09BY006 008 012 014 016 024006 SO008 SO*012 SO014 SO016 SOLEGENDS—StandardO—Optional*Field manif

Strany 18 - Tab 4a 4a

Step 2 — Rig and Place UnitRIGGING — The 09BY units are mounted on skids. Leavethe unit on the skid until it is in the final position. While onthe skid

Strany 19 - A. Preliminary Information

Step 3 — Install Accessory Low-Ambient Kit orInlet Filter Kit (If Required) (See Fig. 7) —If theunit will be operated with inlet air to the condenser

Strany 20 - C. Start-Up

Step 4 — Install Rain Drain (See Fig. 8)IMPORTANT: A rain drain connection MUST BEUSED if any possibility exists of rain water enteringthe unit.The 09