The 19XL machine is factory assembled, wired, and leak tested. Installation (not by Carrier)
consists primarily of establishing water and electrical services to the machine. The rigging,
installation, field wiring, field piping and insulation of waterbox covers are the responsibility of
the contractor and/or customer. Carrier has no installation responsibilities for the equipment.
Job Data
Necessary information consists of:
job contract or specifications
machine location prints
rigging information
piping prints and details
field wiring drawings
starter manufacturer’s installation details
Carrier certified print
Equipment Required
mechanics tools (refrigeration)
volt-ohmmeter and clamp-on ammeter
leak detector (halide or electronic)
absolute pressure manometer or wet-bulb vacuum indicator
portable vacuum pumps