Carrier RTU OPEN 11-808-427-01 Specifikace Strana 11

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 88
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 10
RTU Open 5
To install the RTU Open:
1 Mount the controller (page 6).
2 Wire the controller for power (page 7).
Using the rooftop equipment control power transformer (page 8).
Using an auxiliary control power transformer (page 8).
3 Set the controller's address (page 9).
4 Wire inputs and outputs (page 12).
5 Wire sensors to the controller (page 18).
Field-supplied hardware
An RTU Open retrofit installation may require the following field-supplied components:
wiring harness: Part #OPN-RTUHRN
transformer 24 Vac, 20 VA minimum
wiring
Application-dependent components
:
carbon dioxide sensors
damper/damper actuator
differential pressure switch
enthalpy switch
fan status switch
door switch
fan section door switch
relative humidity sensor
remote occupancy contact
smoke detector
temperature sensors
Installation
Zobrazit stránku 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 87 88

Komentáře k této Příručce

Žádné komentáře